Phase 2 Update – August 2025
On the first floor, demolition of dividing walls is well underway. These changes are already opening up rooms into larger, flexible spaces that will be perfect for a wide range of uses, from community events to creative workshops. It’s a dramatic shift that lays the groundwork for a much more versatile Orbit.

A major structural rework is progressing in the central section of the building, preparing for the installation of our new lift shaft. This is one of the more complex parts of the project and represents a crucial step towards making the building more accessible.
Work has now started on the new overflow café and events space, located on the corner of the building by the large bay window overlooking All Saints Church. Internal walls have been removed, and the flooring has been replaced with reinforced structural supports alongside a new base flooring to ensure the space is ready for future use.

July has brought some exciting visible developments:

With walls coming down, spaces opening up, and structural work progressing well, the transformation of the Orbit’s upper floors is truly underway. Each phase brings us closer to a vibrant, multi-purpose cultural hub for Wellington, a place where everyone is welcome and inspired.